We need to workout the detail for this cross over. The drain and gas pipe comes below the window sill level to avoid the collision of the window frame that opens to the void in the adjacent room. Earlier the AC contractor suggested to embed the AC service line in the wall screed. The AC is too close to the Bedroom door frame hence the AC power socket will move towards the electric duct as much possible to make room on the right hand side.

I've asked the new engineer Mr. Maxam to make a shop drawing for this issue. Hope he will give this a solution.
ReplyDelete