Tuesday, November 2, 2010
Ground Floor Trench and Riser Connection
^ click on image for larger version ^
Image showing the 2 options of paths, the sewer line and fresh water lines can take to join the Ground Floor Trench. The GREEN line shows the previous recommendation by the MNE engineer. The RED line shows the new proposed path that can be taken by the sewer line for the 10 bath rooms of this duct. The engineer will mark the ceiling line after the 1:100 level slope is taken by the sewer line on the left hand side (West side). The is to begin tomorrow morning at site as per the path shown in RED.