Zebra Residence
A blog about the ongoing construction works at Zebra Residence.
Tag Cloud
db ceiling kitchen livingroom
(1)
Saturday, October 30, 2010
Ground Floor Trench Works
Ground floor trench works. Excavated and lean concrete and trench base completed in trench area at the front of the plot. Pipe laying started. Duct wall foundation in progress. Well area excavated to make trench in garage area.
No comments:
Post a Comment
Newer Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment