Zebra Residence
A blog about the ongoing construction works at Zebra Residence.
Tag Cloud
db ceiling kitchen livingroom
(1)
Saturday, October 30, 2010
Perlin anchor strip fixing
Celing level, water marks have been established in 2nd floor all areas. Perlin anchor strip fixing around the perimeter of rooms started. The image shows ongoing work in Apartment A - Living Area.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment